Call (408) 676-9376

Welcome to PowerCurtain!

CL-920 Installation & Configuration Instructions

CL-920 track unpacking & assembling instructions video


Track unfolding and assembling instructions for your newly purchased CL-920 Motorized PowerCurtain Track System

Peel off protective clear film from both sides of the track

Unfold and assemble the track as follows

• Pay attention to the Green Belt inside the Track, make sure it is inside the channel of the track and does not slip out of the channel during the course of assembling
• Pay attention to the joint when securing Track Connector to avoid uneven edge/joint. If the joint is found uneven, please email our support team a picture for solution
• Pay attention to the Drive Unit and the Idler and that they are inserted into the Track with minimal force. (Drive Belt may get stuck by pushing it into the Track with too much force. In this case, the Carrier will not travel the whole track. If this happens, carefully pull the Drive Unit and Idler out of the Track and insert them back to the Track again with minimal force)
• Note: Test the Carrier before proceeding to next step. Hand move the Master Carrier back and forth the whole track a few times to make sure the Master Carrier is travelling smoothly along the track. (If not, reverse the steps and start over again step by step carefully. Please do not hesitate to contact us for help if needed)


Mounting brackets

DO NOT mount the track or insert motor into the track until the track is fully manually tested by hand
• After the Track is fully tested and working properly by hand, see following link: Instructions
• While moving and holding the Track for mounting, at least 2 people are suggested to help you in order to avoid deforming the Track
• When Track is over 8 feet long, there is usually a joiner, connecting two sections of the Track together. You need to hold the joiner with both hands, right and left, to prevent any deformation of the Track


Power connection

Connection diagrams

Programming the motor

• Watch video: Inserting CL-920 Motor
• 1-Channel Remote Control: Programming Instructions
• Multi-Channel Remote Control: Programming Instructions


CL-920 Additional Installation & Configuration Instructions:

• CL-920A single track system set-up instructions  | View |   Download |
• CL-920C4 single track system set-up instructions  | View |   Download |
• CL-920 one channel remote control programming instructions  | View |   Download |
• CL-920 three channel remote control programming instructions  | View |   Download |
• CL-920 wireless wall control R-35C1 & C2 instructions  | View |   Download |
• CL-920 ripplefold style track assembling instructions  | View |   Download |
• CL-920 TP Link smart plug & adapter 1450 cable instructions  | View |   Download |
• CL-920 measuring standard & regular curves instructions  | View |   Download |